Sun Spritz™ Tanning Booth Installation Installation Information, Requirements and Responsibilities Included with the Sun Spritz™ system we provide component installation and training collateral for your salon. The salon is responsible for being prepared for the Sun Spritz™ system prior to its installation. The following are basic requirements and things that MUST BE COMPLETED prior to system installation arrival on-site:
Strip operational and properly located
Dedicated Room The Sun Spritz™ system should have a dedicated room for its use only. The room must be at a minimum of 7’ x 7’ (84” x 84”); slightly larger is always better. The room floor must be level and free of obstructions. Preferred floor cover type is tile or linoleum, carpeted floors are not recommended. Overhead lighting is also required, the system is not provided with lights. Electrical Service The Sun Spritz™ unit requires a 220 VAC electrical service for operation. A standard 3plex electrical outlet is sufficient for proper operation or a standard Duplex Outlet with Outlet Strip. Under no circumstances will installers be responsible for electrical service installation. Fresh Water Drain A fresh water supply is required for booth sanitizing and wash-down after each tanning session. Cold-water service is required with a minimum of 40 pounds of pressure capable of 8 gpm. Water service needs to be quipped with an on/off valve located in the room with easy access. We recommend that water service to the Sun Spritz™ system be turned off each night. Although the system is fully self-contained, a drainpipe is required to remove wash-down water from the booth. The Sun Spritz™ system is equipped with a fully automatic discharge pump for the removal of wash-down water. The discharge pump provided is capable of overcoming 70 ft. of head pressure or approximately 30 PSI. A minimum drainpipe inside diameter of 3/8” is required. Drainage should be directed to the sewer system. In no way what so ever is Sun Spritz™ responsible for the integrity of the hoses or piping installed for fresh water and drain service. Under no circumstances will installers be responsible for fresh water or drainpipe installation. The unit utilizes 3/8 OD High Pressure Plastic Hose from the unit attaching to supply by a Quick-Connect fitting. The final connection will require the Quick-Connect fitting with 1/4” MIP. being threaded into the customer supplied 1/4” FIP. fitting with a shut off valve. Note: In an existing salon a normal clothes washer cold water supply and drain can be accessed. The plastic 3/8” lines will need to be pre-run before delivery. (1-for cold water supply and 1 for wash down water drain.) Customer is aware that he/she will be responsible for running and locating all wiring pertinent to the Sun Spritz™ and it’s timing system and modem. Yes Customer is aware that he/she is responsible for and maintenance of all plumbing required for the Sun Spritz™.
Customers’ responsibility! Customer claims sole responsibility for any/all modification to the facility. Installation personnel will not make modifications of any kind. (Door openings, wall. etc.)
|
|
Contact Us | Privacy Policy
Copyright © 2004 True Exposure Tanning